
Full Rewires
- Standard
- BS 7671:2018+A2
- Duration
- 4–6 days (3-bed)
- Cert
- EIC issued
- ▸ Whole-house and single-circuit rewires
- ▸ Floor and wall chasing, made good
- ▸ New consumer unit and testing included
- ▸ Building regs certificate issued
// SERVICE_CATALOGUE






// FAQ
Not always. We test first and only recommend a board upgrade if the existing one can't be made safe — and we'll show you the test results.
A three-bedroom house is usually four to six working days, and we can do it room by room so you keep hot water and a working kitchen.
Yes. As an OZEV authorised installer we claim the grant on your behalf — you just sign the consent form.
Regularly. Reports arrive digitally within 24 hours with photographs of every observation, and we quote any C2 fixes up front.
Most of our work is Victorian and inter-war terraces. We deal with rubber, lead and fabric wiring weekly and will tell you honestly what's safe.